Erhard's Electric Renewable Energy Worksheet
|
Click
here to print this worksheet |
| Essentials | Watts | Runtime Per Day |
Watt Hours per Day | Approximate Cost |
| Water Pump | ||||
| Heating System | ||||
| Fridge | ||||
| Basics | ||||
| Lights | ||||
| Radio | ||||
| Microwave | ||||
| Washing Machine | ||||
| Nice to Have | ||||
| Computer | ||||
| TV | ||||
| Cooking | ||||
| Answering Machine | ||||
| Electric Cooking | ||||
| Toaster | ||||
| Fax Machine | ||||
| Photocopier | ||||
| Clock | ||||
| Watts
= Voltage X Current EG 120 Volts x 12 AMPS = 1440 watts |
||||
| Minimum
inverter size needs to be able to handle the maximum connected
load.
It also needs to be able to handle the surge current for a motor starting in addition to the load already operating. The place where this is noticed most is when, for example, there is a load of 15 amps on the inverter and the water pump kicks on with a surge current of 64 amps. Generally that surge current is of a short enough duration that the motor will start, though something to keep in mind when sizing the inverter. A good thing to use as far as a water pump goes is either a Grundfos SQ series pump which does not have this start up surge or a DC Pump. At this stage the DC Pumps require relatively frequent maintenance so I would recommend the SQ Pump. |
||||
| Inefficiencies
These can be a significant user of the available power.
|
||||
| Batteries
Batteries have a certain life span and you get what you pay for. Better batteries will have much thicker plates to give many more years of service. Generally I would recommend enough charging capacity to keep the batteries cycling to no more than 50% full; this will significantly prolong the battery life. If batteries are cycled to less than 50%, they will need to be replaced sooner - therefore added cost. I prefer to spend more on the charging aspect up front rather than have to replace batteries sooner. Another option is to have a generator to charge the batteries if they get below a certain level (if it is too expensive at this point to have a large enough solar or wind capacity). |
||||
| Price
Calculations
In terms of figuring generating costs, you can use a rough figure of about $800 per 100 watt panel. So to figure out how much each item would cost in generating capacity: you would use a winter figure of about 200 watts per day produced from a 100 watt panel per day on the average - therefore each 1000 watt hours per day costs about $4,000. using solar. Wind calculations would work a bit different. For example an AWP 3.6 would produce an average of 4000 watt hours per day with an average 10 MPH wind. Therefore if the cost of the wind generator and tower is about $10,000.00 - the cost per 1000 watt hours is about $2500. If the average wind speed is 7 1/2 mph the output is about 2000 watt hours per day, therefore about $5,000. per 1000 watt hours. If the average wind speed is about 14 mph, then the output would be about 8000 watt hours per day, therefore about $1,250. per 1000 watt hours |
||||
| Core
Pricing
The core of a system consists of the battery bank, the disconnects, charge controllers, metering and associated wiring. This really depends on how big of a system that you are running, though it does generally amount to a significant amount of the whole system. Once established though, you can keep adding charging equipment generally without doing much with this core. |
||||